In the building, located in the Luxembourg Quarter of Brussels, the subfloors covering the services were made with POLITERM® BLU, EPS beads coated with E.I.A. additive mixed on site with cement and water using a mobile plant and pumped to the floors. The lightweight concrete wraps pipes and ducts, levels the slab and adds thermal insulation with a minimal load on the structure.
SHARE